codex Roadmap¶
Last Updated: 2026-07-11 Version: v0.2.0
Table of Contents¶
- Vision & Mission
- Status Legend
- Current State (2026-04-28)
- Core Capabilities Status
- Infrastructure Maturity
- Evolution Documentation
- Iteration Plan
- Phase 1-5: Foundation (COMPLETE)
- Phase 6: MCP Package System (COMPLETE)
- Phase 7: Cognitive Brain Infrastructure (COMPLETE)
- Phase 8: Documentation Consolidation & agent Enhancement (COMPLETE)
- Phase 9: Coverage & Performance Optimization (COMPLETE)
- Phase 10: Genesis Protocol Foundation (COMPLETE)
- Phase 1 (Current Cycle) Objectives
- High Priority
- 1. MCP Advanced Features (Phase 11)
- 2. Coverage Improvement to 95%+ (Phase 9 extension)
- 3. agent System Enhancement (Phase 12)
- Medium Priority
- 4. Performance Optimization (Phase 9 focus)
- 5. Documentation Excellence
- Low Priority
- 6. MCP Interactive Mode (Phase 13)
- 7. Issue Template for MCP
- Phase 2 (Current Cycle) Objectives
- High Priority
- 1. Level 4 MLOps P1 Gap Closure (SAR Sprint) IN PROGRESS
- 2. MCP Package Merge & Diff Tools (Phase 14)
- 3. agent Autonomy Expansion (Phase 15)
- 4. Self-Evolution Infrastructure (Phase 16)
- Medium Priority
- 5. Advanced Monitoring & Observability
- 6. Coverage to 95%+
- Phase 3 (Current Cycle) Objectives
- High Priority
- 1. MCP Smart Recommendations (Phase 17)
- 2. Production Scaling Enhancements (Phase 18)
- 3. Cross-repository agent Capabilities (Phase 19)
- Long-term Vision (2026-Phase 4+)
- Areas of Exploration
- Success Metrics
- Technical Metrics
- Operational Metrics
- Business Metrics
- Known Blockers & Dependencies
- Current Blockers
- Potential Blockers
- Maintenance & Updates
- Update Frequency
- Review Cycle
- Ownership
- Related Documents
**Last Updated: 2026-06-22
Purpose: Historical planning baseline for _codex_ with capability claims, iteration plans, and future targets.
**Roadmap Baseline Date 2026-07-13
Evidence boundary: “Complete,” percentages, dates, and performance figures below are historical planning claims from this baseline unless a current repository path is cited. They are not current operational attestations. Use
REPOSITORY_EXPLANATION.mdand current test/CI artifacts for verified present state.
Vision & Mission¶
Vision: Build the most advanced AI-powered ML platform with autonomous agent orchestration, enabling self-evolving systems and seamless human-AI collaboration.
Mission: Deliver production-ready MLOps infrastructure (Level 4) with comprehensive automation, agent-driven workflows, and intuitive AI interfaces for continuous improvement.
Status Legend¶
| Icon | Status | Description |
|---|---|---|
| Complete | Marked complete in this historical roadmap; not independently attested here | |
| Active | In development, on track | |
| Planning | Designed, ready to start | |
| Blocked | Waiting on dependencies | |
| Deferred | Postponed, low priority | |
| Pending | Queued for future iteration |
Historical State Snapshot (dated 2026-04-28)¶
Core Capabilities Status¶
| Capability | Status | Completion | Notes |
|---|---|---|---|
| Codex Ingestion Pipeline | Complete | 100% | Ingest Analyze Transform Verify |
| agent System Core | Complete | 100% | workflow, quantum, physics orchestration |
| RAG & Verification | Complete | 100% | CoVe, MCP adapters, embeddings |
| MCP Package System | Complete | 100% | 9 topics, workflow automation, 93+ KB docs |
| CI/CD Infrastructure | Complete | 100% | 100 workflows active, cache L1–L5 wired, self-healing CI |
| Security Infrastructure | Complete | 100% | Secrets scan, SAST, CodeQL, 48 CVEs fixed |
| Test Suite | Complete | 100% | 21,500+ tests, coverage ratchet in progress |
| Documentation Hub | Complete | 95% | 693+ files, evolution center, cognitive brain |
| Cognitive Brain | Complete | 100% | 100+ files, 22 cognitive modules, pattern detection |
| Genesis Protocol | Foundation Ready | 80% | 3-layer safety, awaiting secret injection |
| agent Autonomy | Active | 70% | 53+ agents deployed, coordination in progress |
Infrastructure Maturity¶
| Area | Level | Target | Gap |
|---|---|---|---|
| MLOps Maturity | Level 3.95 | Level 4 | P1 gaps resolved (SAR-G01/G02/G05) — see SAR_METHODOLOGY.md §10 |
| Test Coverage | 90% | 95%+ | 5%+ |
| Security Posture | Elite | Elite | None |
| CI/CD Performance | Optimized | <3 min | Near target |
| Cache Efficiency | Multi-layer | 95%+ | Incremental caching active |
| Documentation | 95% | 98%+ | Evolution center added |
Evolution Documentation¶
| Resource | Purpose | Status |
|---|---|---|
| Evolution Timeline | Phase-by-phase verified history | Active |
| Planset Registry | Queryable PS-01PS-10 catalog | Active |
| Evolution Tree | Mermaid process mapping | Active |
| AI Storyboard | Emergence narrative | Active |
Iteration Plan¶
Phase 1-5: Foundation (COMPLETE)¶
Timeline: 2025-Q4 to 2025-12-29 Status: Complete
Delivered: 1. Codex ingestion pipeline (Python code processing) 2. agent system core (workflow, quantum, physics) 3. RAG & verification infrastructure 4. CI/CD optimization (Phase 3C-Lite caching) 5. Security infrastructure (secrets scan, SAST) 6. Test suite expansion (21,500+ tests) 7. PR #2668 review fixes
Phase 6: MCP Package System (COMPLETE)¶
Timeline: 2025-12-29 to 2025-12-30 Status: Complete Completion: 100%
Delivered: 1. Core packaging infrastructure (CLI, scripts, workflows) 2. 9 predefined topics with dropdown menu 3. 3 test packages created and validated 4. 93+ KB comprehensive documentation (8 guides) 5. Advanced features roadmap (Cycle 1-Phase 3) 6. All PR review comments resolved
Commits: c257a5e, 1fc7a01, f769e52, 66cc35c, 299afa1, 34cc1c2
Phase 7: Cognitive Brain Infrastructure (COMPLETE)¶
Timeline: 2025-12-30
Status: Complete (100%)
Verified: 2026-02-11 — Evidence in .codex/cognitive_brain/ (100+ files), scripts/cognitive/ (22 modules)
Tasks: 1. Create CODEBASE_COGNITIVE_MAP.md - Architecture overview 2. Create CODEBASE_DASHBOARD.md - Live status dashboard 3. Create ROADMAP.md - This unified roadmap 4. Cognitive brain core modules (cognitive_brain_core.py, meta_learning_engine.py) 5. Pattern detection and metrics collection 6. CI/CD optimization (58% speedup, exceeding 50% target)
Deliverable: Unified "cognitive brain" for AI agent navigation and context
Phase 8: Documentation Consolidation & agent Enhancement (COMPLETE)¶
Timeline: 2025-12-31 to 2026-01-03 Status: Complete (100%) Verified: 2026-02-11 — PS-08 confirms microservice cleanup; 693+ files indexed
Completed Tasks:
1. Consolidated fragmented documentation (693+ files cataloged)
2. Created cross-reference index (docs/DOCUMENTATION_INDEX.md)
3. Normalized agent file structure (.github/agents/ — 287 files)
4. Microservice root cleanup (audio service src/services/audio/)
5. Configs centralized (configs/services/)
Deliverable: Unified documentation system, normalized agent architecture
Phase 9: Coverage & Performance Optimization (COMPLETE)¶
Timeline: 2026-01-06 to 2026-01-13 Status: Complete (100%) Verified: 2026-02-11 — PS-09 confirms unified training; 90% coverage threshold active
Completed Tasks: 1. Coverage analysis and threshold established (90%) 2. Training entry point unified via Hydra (PS-09) 3. CI/CD optimization with multi-layer incremental caching 4. Cache strategy refinement (tool-specific layers on base caches) 5. Test execution improvements
Deliverable: 90% coverage threshold, optimized builds, multi-layer caching
Phase 10: Genesis Protocol Foundation (COMPLETE)¶
Timeline: 2026-01-13 to 2026-01-20 Status: Foundation Complete (awaiting activation) Verified: 2026-02-11 — PS-10 confirms owner guard enforcement; 3-layer safety active
Completed Tasks:
1. Owner guard CI/CD enforcement (PS-10)
2. Three-layer safety system (workflow + script + config guards)
3. Autonomous agent framework (scripts/autonomous_agent.py)
4. Audit trail system (.codex/evidence/)
5. Genesis bootstrap template created
6. Secret injection (CODEX_MASTER_KEY) — awaiting human admin
7. Full activation (SAFE_MODE False) — blocked on secret injection
Deliverable: Genesis foundation ready; activation awaiting human admin
Blocker: Human admin secret injection required for full Genesis activation
Phase 1 (Current Cycle) Objectives¶
High Priority¶
1. MCP Advanced Features (Phase 11)¶
Timeline: 2026-01-20 to 2026-02-28 Status: Active (infrastructure complete, CLI features pending) Effort: 10-15 sessions (~300K-500K tokens)
Features: 1. Size estimation (--estimate flag) - 2-3 iterations 2. Exclude patterns (--exclude parameter) - 2-3 iterations 3. Duplicate resolution (hash suffix) - 3-4 iterations 4. Package diff tool (compare packages) - 3-4 iterations
Deliverable: 4 advanced features operational
Documentation: Update ADVANCED_FEATURES_PLANSET.md with implementation details
2. Coverage Improvement to 95%+ (Phase 9 extension)¶
Timeline: 2026-04-13 to 2026-05-22 (execution window within Phase 9: 2026-04-01 to 2026-06-30) Status: Active Effort: 5-8 sessions (~150K-300K tokens)
Tasks: - Identify uncovered critical paths - Add missing unit tests - Expand integration tests - Property-based testing expansion - Raise lower-covered components to at least 90%
Target: 95%+ overall coverage, maintain 100% passing, with no critical component below 90%
3. agent System Enhancement (Phase 12)¶
Timeline: 2026-02-01 to 2026-03-15 Status: Planning Effort: 8-12 sessions (~250K-400K tokens)
Tasks: - Advanced agent capabilities (multi-step reasoning) - Self-evolution infrastructure - agent coordination protocols - Learning from feedback loops - Enhanced context awareness
Deliverable: Advanced autonomous agent capabilities
Medium Priority¶
4. Performance Optimization (Phase 9 focus)¶
Timeline: 2026-01-06 to 2026-02-28 Status: Pending
Targets: - CI/CD builds: <3 minutes - Cache hit rate: 95%+ - Test execution: <3 minutes - Parallel execution optimization
5. Documentation Excellence¶
Timeline: Ongoing (2026-01 to 2026-03) Status: Active
Tasks: - Maintain cognitive brain (map + dashboard) - Keep roadmap current - Update API documentation - Expand capability guides - Create video tutorials (optional)
Low Priority¶
6. MCP Interactive Mode (Phase 13)¶
Timeline: 2026-03-15 to 2026-03-31 Status: Planning Effort: 5-7 iterations
Features: - TUI file selector - Real-time size preview - Dynamic include/exclude - Save selection as topic
7. Issue Template for MCP¶
Timeline: TBD Status: Deferred Rationale: Low demand, optional
Phase 2 (Current Cycle) Objectives¶
High Priority¶
1. Level 4 MLOps P1 Gap Closure (SAR Sprint) IN PROGRESS¶
Timeline: Current cycle (live schedule maintained in docs/ops/SAR_METHODOLOGY.md)
Status: In progress (as of 2026-05-08 update) — 2 of 3 P1 gaps RESOLVED; SAR-G03 partial (75/100); cycle remains open through 2026-05-31
Reference: docs/ops/SAR_METHODOLOGY.md — executable planset §12
| Gap | Owner | Playbook | ETA |
|---|---|---|---|
| SAR-G01: 7 Codespace secrets RESOLVED | @mbaetiong | §13 GITHUB_VARIABLES_MASTER_GUIDE.md | Complete (2026-03-07) |
| SAR-G02: Feature store — SQLite production backend | @copilot | feast_compat.py + SQLiteBackend (S116) | Complete (P1 gap, 2026-03-07); enhancement ETA 2026-06-30 (Redis/Feast swap) |
| SAR-G03: Auto-retrain GHA workflow OPEN — Partial (75/100) | @copilot | model-drift-retrain.yml | 2026-06-30 (prod data source) |
Success criterion: All 3 gaps resolved ROADMAP MLOps level updated to Level 4 docs/archive/LEVEL_4_MLOPS_ASSESSMENT.md approval updated.
2. MCP Package Merge & Diff Tools (Phase 14)¶
Timeline: 2026-04-01 to 2026-04-30 Features: Package merge (4 strategies), diff tool with multiple formats
3. agent Autonomy Expansion (Phase 15)¶
Timeline: 2026-05-01 to 2026-06-15 Focus: Multi-agent coordination, distributed execution, advanced reasoning
4. Self-Evolution Infrastructure (Phase 16)¶
Timeline: 2026-05-15 to 2026-06-30 Focus: Learning from operations, adaptive optimization, self-improvement
Medium Priority¶
5. Advanced Monitoring & Observability¶
Timeline: 2026-04-01 to 2026-05-31 Focus: Real-time metrics, dashboards, alerting, performance tracking
6. Coverage to 95%+¶
Timeline: 2026-04-01 to 2026-06-30 Focus: Comprehensive test coverage, edge cases, integration scenarios
Phase 3 (Current Cycle) Objectives¶
High Priority¶
1. MCP Smart Recommendations (Phase 17)¶
Timeline: 2026-07-01 to 2026-07-31 Features: Git analysis, auto-packaging, topic recommendations
2. Production Scaling Enhancements (Phase 18)¶
Timeline: 2026-08-01 to 2026-09-15 Focus: Multi-repository support, distributed agents, enterprise features
3. Cross-repository agent Capabilities (Phase 19)¶
Timeline: 2026-08-15 to 2026-09-30 Focus: Multi-repo coordination, knowledge sharing, unified orchestration
Long-term Vision (2026-Phase 4+)¶
Areas of Exploration¶
- Multi-Language Support
- Extend beyond Python (JavaScript, Go, Rust)
- Universal code ingestion pipeline
-
Language-agnostic transformations
-
Enterprise Features
- Multi-tenant architecture
- Role-based access control
- Audit trails and compliance
-
SaaS deployment options
-
Advanced AI Integration
- Multiple LLM provider support
- Fine-tuned models for domain tasks
- Advanced reasoning capabilities
-
Multimodal support (code + diagrams + docs)
-
Developer Ecosystem
- Plugin architecture
- Third-party integrations
- Community contributions
-
Marketplace for capabilities
-
Research & Innovation
- Novel agent architectures
- Quantum-inspired optimizations
- Physics-based decision making
- Self-organizing systems
Success Metrics¶
Technical Metrics¶
| Metric | Current | Cycle 1 Target | Cycle 2 Target | Cycle 3 Target |
|---|---|---|---|---|
| Test Coverage | 90% | 95%+ | 97%+ | 98%+ |
| CI/CD Build Time | <5 min | <3 min | <2 min | <2 min |
| Cache Hit Rate | 90%+ | 95%+ | 97%+ | 98%+ |
| Security Score | 100% | 100% | 100% | 100% |
| Documentation | 95% | 95%+ | 98%+ | 100% |
Operational Metrics¶
| Metric | Current | Cycle 1 Target | Cycle 2 Target | Cycle 3 Target |
|---|---|---|---|---|
| agent Autonomy | 70% | 70%+ | 85%+ | 95%+ |
| Session Success Rate | 85%+ | 90%+ | 95%+ | 98%+ |
| Iteration Cycle | 1-2 iterations | 1 iteration | <1 iteration | <1 iteration |
| Blocker Resolution | 100% | 100% | 100% | 100% |
Business Metrics¶
| Metric | Current | Cycle 1 Target | Cycle 2 Target | Cycle 3 Target |
|---|---|---|---|---|
| Developer Productivity | High | Very High | Exceptional | |
| Time to Feature | Iterations | Commits | Commits | Pre-commits |
| Bug Resolution Time | Commits | Pre-commits | Pre-commits | Automated |
| Documentation Quality | Good | Excellent | Exceptional |
Known Blockers & Dependencies¶
Current Blockers¶
Updated 2026-07-07 (W-142 S116): Level 3.95 — P1 gaps resolved (SAR-G01/G02/G05 COMPLETE).
| Blocker | Impact | Mitigation | Status |
|---|---|---|---|
| SAR-G01: 7 Codespace secrets missing | High | Set at org level — human admin required (see §13 of GITHUB_VARIABLES_MASTER_GUIDE.md) |
RESOLVED W-142 (2026-03-07) |
| SAR-G02: Feature store | High | Redis + SQLite backends in feast_compat.py + Arrow IPC; 97/100 |
RESOLVED W-142 |
| SAR-G03: Auto-retrain trigger | High | model-drift-retrain.yml wired (daily cron + dry_run=true); accepted infrastructure limitation — production data source requires external MLOps infra not present in this repo; tracked via ETA 2026-06-30 |
OPEN — Partial (75/100) |
| SAR-G05: Distributed tracing | Medium | drift_span() + OTEL_EXPORTER_OTLP_ENDPOINT live in devcontainer |
RESOLVED W-142 (100/100) |
Potential Blockers¶
| Blocker | Impact | Mitigation | Status |
|---|---|---|---|
| Genesis secrets not ready | Medium | CODEX_MASTER_KEY confirmed org-level; Codespace secrets resolved under SAR-G01 (W-142) |
Partially mitigated |
| Cache limit constraints | Low | Emergency cleanup, monitoring | Mitigated |
| CI/CD quota limits | Low | Optimized workflows, selective triggering | Mitigated |
| Token budget per session | Low | Duration-aware planning, continuation prompts | Mitigated |
Maintenance & Updates¶
Update Frequency¶
- Roadmap: Per-phase or after major milestones
- Dashboard: Real-time (every session)
- Cognitive Map: Monthly or after architecture changes
Review Cycle¶
- Per-phase: Progress check, adjust priorities
- Monthly: Strategic review, roadmap refinement
- Quarterly: Vision alignment, long-term planning
Ownership¶
- Primary: DevOps + agent Development Team
- Human Admin: @mbaetiong
- AI agent: GitHub Copilot (autonomous updates)
Related Documents¶
- Cognitive Map - Architecture overview
- Dashboard - Live status
- Contributing - How to contribute
- Architecture - Technical architecture
- MCP Planset - MCP roadmap details
Roadmap Status: Active & Current Last Content Update: 2026-05-14 (S873 — Phase 9 Autonomous Ops 95% complete; PR #4356; mermaid maps v0.2.0) Next Projected Update: 2026-06-06 (planned: Phase 9 completion milestone) Next Review: 2026-06-06 Version: 2.1.1
Questions? Check Dashboard for current status.
Want to contribute? See phase-specific tasks above or Contributing Guide.